Concrete Slab Calculator

Calculate ready-mix cubic yards, cubic feet, and 60 lb or 80 lb pre-mixed concrete bag counts for patios, driveways, garage floors, and shed slabs.

Last updated: By Abubaker Chughtai (Software Engineer & Calculator Developer)
ft
Length of your formed slab, patio, or driveway section.
ft
Width between inside faces of your 2×4 or 2×6 form boards.
in
Standard patio/walkway = 4 in; passenger driveway/garage = 5 to 6 in.
%
Contractors add 8%–10% to cover uneven gravel subbase and form deflection.
$/yd³
US ready-mix concrete averages $145–$195 per cubic yard delivered.
$/bag
Standard 80 lb Quikrete or Sakrete bags run $5.50–$7.50 at home centers.
Updates live as you type

Material Estimate

US Imperial
Ready-Mix Concrete to Order
2.72cubic yards (yd³)
73.33 cu ft total (includes 10% waste; 66.67 cu ft net)
80 lb Pre-Mixed Concrete Bags
123bags (80 lb)
Each 80 lb bag yields 0.60 cu ft (9,840 lbs total dry weight)
60 lb Pre-Mixed Concrete Bags
163bags (60 lb)
Each 60 lb bag yields 0.45 cu ft (or 196 × 50 lb bags)
Estimated Concrete Cost
$448.15 (Ready-Mix)
Or $799.50 if buying 123 × 80 lb bags

How to Use This Calculator

  1. 1Select By Slab Dimensions to enter Length and Width, or By Total Square Footage if you already measured a multi-section patio or walkway.
  2. 2Enter the Slab Thickness in inches (or centimeters in Metric mode). A standard 2×4 form board measures 3.5 inches actual depth, while a true 4-inch slab is the residential building code minimum for patios and sidewalks.
  3. 3Set your Subgrade & Spillage Waste Factor. Most flatwork contractors add 10% so an uneven gravel base or slightly bowed perimeter form never leaves the pour short.
  4. 4Enter your local Ready-Mix Price per Cubic Yard and 80 lb Bag Price to compare whether ordering a redi-mix truck or mixing bags yourself makes financial sense.
  5. 5Review both your cubic yards for ready-mix delivery and exact bag counts for 80 lb, 60 lb, and 50 lb bags.

Formula & Material Math

Concrete volume is measured in cubic feet for small bagged projects and cubic yards (1 cubic yard = 27 cubic feet) for ready-mix truck deliveries. Converting slab measurements into cubic yards requires expressing length, width, and thickness in feet first.

1. Net Slab Volume in Cubic Feet
Net Volume (cu ft) = Length (ft) × Width (ft) × (Thickness in Inches ÷ 12)

Divide the slab thickness in inches by 12 to convert inches into feet before multiplying by the surface area.

2. Total Cubic Yards with Waste Factor
Total Cubic Yards (yd³) = [Net Volume (cu ft) × (1 + Waste % ÷ 100)] ÷ 27

Because a cube measuring 3 ft × 3 ft × 3 ft holds 27 cubic feet, dividing total cubic feet by 27 converts volume to cubic yards.

3. Pre-Mixed Concrete Bag Counts
80 lb Bags = CEILING(Total Volume in cu ft ÷ 0.60)
60 lb Bags = CEILING(Total Volume in cu ft ÷ 0.45)
50 lb Bags = CEILING(Total Volume in cu ft ÷ 0.375)

Standard pre-blended concrete yields 0.60 cubic feet per 80 lb bag and 0.45 cubic feet per 60 lb bag when mixed with water.

Example Calculation: 20 ft × 10 ft Backyard Patio Slab (4 Inches Thick)

Project Scenario: You are pouring a 20 ft × 10 ft concrete patio at a true 4-inch thickness with a 10% waste allowance, comparing ready-mix concrete at $165/yd³ against 80 lb bags at $6.50/bag.

Step 1: Calculate Slab Surface Area
20 ft × 10 ft
= 200 sq ft
Step 2: Convert 4-Inch Thickness to Feet & Multiply for Net Cubic Feet
200 sq ft × (4 in ÷ 12 in/ft)
= 66.67 cu ft
Step 3: Apply 10% Waste Factor
66.67 cu ft × 1.10
= 73.33 cu ft
Step 4: Convert Cubic Feet to Ready-Mix Cubic Yards
73.33 cu ft ÷ 27 cu ft/yd³
= 2.72 cubic yards
Step 5: Calculate 80 lb & 60 lb Bag Equivalents
CEILING(73.33 ÷ 0.60) | CEILING(73.33 ÷ 0.45)
= 123 bags (80 lb) or 163 bags (60 lb)
For a 20×10 patio slab poured 4 inches thick with 10% waste, order 2.75 to 3.0 cubic yards of ready-mix concrete (~$448) or 123 bags of 80 lb concrete (~$800). Because the pour exceeds 1.5 cubic yards, ready-mix delivery is cheaper and far faster than mixing 9,840 lbs of dry bags by hand.

Concrete Slab Coverage & Bag Yield Chart (Per 100 Sq Ft & Per Cubic Yard)

Reference chart showing cubic yards and bag requirements across common slab depths, including standard residential 4-inch patios and 6-inch heavy driveways.

Slab ThicknessTypical ApplicationCubic Yards per 100 Sq Ft (Net)80 lb Bags per 100 Sq Ft (Net)60 lb Bags per 100 Sq Ft (Net)
3.5 inches (Actual 2×4 Form)Light walkways, shed pads, AC pads1.08 yd³ (29.2 cu ft)49 bags65 bags
4.0 inches (Standard Code)Patios, sidewalks, basement floors1.23 yd³ (33.3 cu ft)56 bags75 bags
5.0 inchesLight garage floors, golf cart paths1.54 yd³ (41.7 cu ft)70 bags93 bags
6.0 inches (Actual 2×6 = 5.5")Residential driveways, RV pads, shops1.85 yd³ (50.0 cu ft)84 bags112 bags
8.0 inchesHeavy truck aprons, structural mats2.47 yd³ (66.7 cu ft)112 bags149 bags

When to Order a Ready-Mix Concrete Truck vs. Mixing Bags

A single cubic yard of concrete weighs approximately 4,000 pounds (2 tons) and takes 45 bags of 80-pound dry mix or 60 bags of 60-pound mix. When you factor in lifting each bag into a portable barrel mixer, adding water, wheelbarrowing it to the forms, and screeding before the previous batch starts to set in summer heat, most DIY crews hit a physical limit around 1.0 to 1.5 cubic yards (45 to 68 bags).

Even though ready-mix concrete plants charge a "short-load fee" (typically $100 to $200 extra) for orders under 4 to 5 cubic yards, a ready-mix truck becomes cost-competitive right around 2 cubic yards—and delivers a uniform 3,500 to 4,000 PSI air-entrained mix in 15 minutes instead of 5 hours of back-breaking mixing.

Understanding 2×4 and 2×6 Form Board Thickness vs. True Slab Depth

If you build your perimeter forms out of standard 2×4 dimensional lumber and grade your gravel base flush with the bottom of the boards, your slab is actually 3.5 inches thick, not 4.0 inches. Across a 200-square-foot slab, the difference between 3.5 inches and 4.0 inches is 8.33 cubic feet (about 14 bags of 80 lb concrete).

If your local building inspector requires a full 4-inch slab depth, either raise your 2×4 form boards 1/2 inch above the compacted gravel base and backfill the exterior toe with dirt so wet concrete cannot blow out beneath the form, or form the perimeter with 2×6 lumber (5.5 inches actual height) and mark a 4-inch screed line inside the boards.

Practical Pro Tips & Common DIY Mistakes to Avoid

Practical Pro Tips

  • • Always compact at least 4 inches of crushed stone subbase (such as 3/4" minus crusher run) beneath exterior slabs to prevent frost heave and slab cracking.
  • • Never order exact net yardage from a ready-mix plant. Ordering 0.25 to 0.50 cubic yards extra costs $45–$90 now, whereas running 4 cubic feet short mid-pour can ruin an entire slab with a cold joint.
  • • Cut control joints to 1/4 of the slab thickness (1 inch deep on a 4-inch slab) spaced no further apart in feet than 2 to 2.5 times the slab thickness in inches (every 8 to 10 feet for a 4-inch slab).
  • • In freeze-thaw climates (northern and midwestern US states), specify 4,000 PSI concrete with 5% to 7% air entrainment and avoid steel-troweling exterior slabs, which traps bleed water and causes surface scaling.

Common Mistakes to Avoid

  • • Forgetting to convert slab thickness from inches to feet before multiplying by square footage—multiplying 200 sq ft × 4 overestimates your concrete volume by 12×.
  • • Adding extra water at the job site to make concrete easier to push with a rake. Excess water increases the water-to-cement ratio, dropping a 4,000 PSI mix down to 2,500 PSI and causing severe surface dusting and shrinkage cracks.
  • • Pouring directly on topsoil or grass instead of stripping organic sod down to undisturbed subsoil and compacting a gravel base.
  • • Skipping thickened edges or rebar/wire mesh reinforcement on driveways and shed slabs where heavy point loads rest near the perimeter.

Frequently Asked Questions

How many 80 lb bags of concrete make 1 cubic yard?
It takes 45 bags of 80-pound concrete to make 1 cubic yard (27 cubic feet), because each 80 lb bag yields 0.60 cubic feet of mixed concrete (27 ÷ 0.60 = 45). If you are using 60-pound bags (0.45 cu ft yield each), it takes 60 bags to equal 1 cubic yard. For 50-pound bags (0.375 cu ft yield), it takes 72 bags per cubic yard.
How much concrete do I need for a 10×10 slab 4 inches thick?
A 10×10 slab poured 4 inches thick requires 33.33 cubic feet (1.23 cubic yards) of concrete net. Adding a 10% waste factor brings the total to 36.67 cubic feet, or 1.36 cubic yards. If buying bagged concrete with 10% waste, you will need 62 bags of 80 lb concrete or 82 bags of 60 lb concrete.
How thick should a concrete patio or driveway slab be?
A standard backyard patio, sidewalk, or garden shed slab should be at least 4 inches thick over a 4-inch compacted gravel base. For a residential driveway carrying passenger cars and SUVs, pour at least 5 to 6 inches thick. If the slab will support a heavy RV, boat trailer, dump trailer, or two-post automotive lift, increase thickness to 6 inches minimum with #4 rebar on 18-inch centers.
How much does a yard of ready-mix concrete cost?
In most US markets, ready-mix concrete costs between $145 and $195 per cubic yard for standard 3,500 to 4,000 PSI gray flatwork mix. Keep in mind that orders under 4 to 5 cubic yards usually incur a short-load delivery fee of $100 to $200, plus extra charges if you request fiber mesh, calcium chloride accelerator, or a concrete pump.
Why do I need a 10% waste factor for a rectangular slab?
Even when your top form dimensions are measured to the fraction of an inch, the compacted gravel subgrade across a 200-square-foot area rarely sits perfectly flat. If the subgrade averages just 3/8 inch lower than planned across the center of the pad, an extra 9% of concrete volume disappears into the bottom of the slab before reaching the top of the screed boards.
What is the actual depth of a slab poured inside 2×4 form boards?
Standard 2×4 lumber measures 1.5 inches by 3.5 inches. If your gravel subbase is graded flush with the bottom edge of 2×4 forms, your concrete slab is 3.5 inches thick (requiring 12.5% less concrete than a true 4-inch slab). Enter 3.5 inches into the thickness field if you are screeding off 2×4s resting flat on the base.

Embed This Concrete Slab Calculator on Your Website

Contractors, hardware stores, and DIY bloggers can embed this live calculator for free with attribution back to BuildCalcs.